Flinders University
Browse

Maximum Entropy Production Evapotranspiration for Australia 2003-2013

dataset
posted on 2021-10-27, 04:59 authored by Olanrewaju AbiodunOlanrewaju Abiodun, Okke BatelaanOkke Batelaan, Huade GuanHuade Guan, Jingfeng Wang
Evaporation, Transpiration, and Evapotranspiration Products for Australia based on the Maximum Entropy Production model (MEP). Introduction of a method into the MEP algorithm of estimating the required model parameters over the entire continent of Australia through the use of pedotransfer function, soil properties and remotely sensed soil moisture data. The algorithm calculates the evaporation and transpiration over Australia on daily timescales at the 0.05 degree (5 km) resolution for 2003 – 2013. The MEP evapotranspiration (ET) estimates were validated using observed ET data from 20 Eddy Covariance (EC) flux towers across 8 land cover types in Australia and compared the MEP ET at the EC flux towers with two other ET products over Australia; MOD16 and AWRA-L products. The MEP model outperformed the MOD16 and AWRA-L across the 20 EC flux sites, with average root mean square errors (RMSE), 8.21, 9.87 and 9.22 mm/8 days respectively. The average mean absolute error (MAE) for the MEP, MOD16 and AWRA-L were 6.21, 7.29 and 6.52 mm/8 days, the average correlations were 0.64, 0.57 and 0.61, respectively. The percentage bias of the MEP ET was within 20% of the observed ET at 12 of the 20 EC flux sites while the MOD16 and AWRA-L ET were within 20% of the observed ET at 4 and 10 sites respectively. The analysis showed that evaporation and transpiration contribute 38% and 62%, respectively, to the total ET across the study period which includes a significant part of the “millennium drought” period (2003 – 2009) in Australia. File naming conventions: E – Evaporation T – Transpiration ET – Evapotranspiration For the 8 day ET, Daily T and ET, the suffix nnn indicates day of year. , for example: 001 for January 1, 145 for May 25 (leap year) or 26, etc. While for the daily E, the suffix is in the format mmdd (month,day) for example 0101 for January 1, 0525 for May 25

Date coverage: 2003-01-01 - 2013-12-31
Location: Australia

History

Primary contact

Mr Olanrewaju Abiodun, lanre.abiodun@flinders.edu.au

Migrated Content

True

Usage metrics

    Flinders University

    Exports

    RefWorks
    BibTeX
    Ref. manager
    Endnote
    DataCite
    NLM
    DC